We brought power to an agricultural site from the grid connection point. With our registered electrician, we built the grid connection and the metering point, then laid the underground cable in protective conduit along the ~800 m route. Along the route we installed three supply points, each with an outdoor distribution cabinet, 230 V and three-phase sockets.
What makes this project stand out is that the route crosses two high-pressure gas transmission pipelines and operational communication cables owned by FGSZ Zrt. We handled the entire utility coordination ourselves. This included the utility statement via the e-közmű system, the crossing design and the FGSZ approval. It was followed by manual excavation within the safety zone under supervision, and a geodetic survey.